RDM vs DMX for Moving Head Lights: Procurement and Commissioning
- Separate DMX Control From RDM Management
- Define the Network Scope Before the RFQ
- Treat RDM Support as a Verified Product Feature
- Build Addressing Around the Approved Fixture Profile
- Design the Physical DMX Layer First
- Plan Discovery and Identification Without Disrupting Production
- Decide Which Parameters May Be Changed Remotely
- Validate Fixture Responses During Commissioning
- Control Firmware, Libraries and Documentation Together
- Select Products With Evidence From Current Data
- Verified DMX512 and RDM product references
- Write FAT and SAT Tests for DMX and RDM
- Prepare a Supplier Documentation Package
- Frequently Asked Questions
Separate DMX Control From RDM Management
For separate dmx control from rdm management, the project team should define control data as an auditable requirement before equipment is ordered. DMX remains the primary control transport for level and attribute data, while RDM adds bidirectional management only where every relevant device supports it. The requirement should identify who may change addresses, modes, labels, or other parameters and when those changes are permitted. This discipline reduces patch errors and makes future substitutions easier to evaluate without weakening the approved control design. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
Buyers should connect device discovery to the console, distribution hardware, fixture firmware, and operating procedure used on the project. RDM capability should never be inferred from a DMX connector, a marketing photograph, or a similar model name. Procurement records should preserve the model, firmware, mode file, manual revision, and test result associated with each accepted unit. Clear evidence also helps rental, venue, and integration teams maintain a mixed fleet without assuming that all fixtures behave identically. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
A commissioning plan must compare show operation against the approved fixture profile and the actual network topology. The installer needs to know which devices pass, block, repeat, or originate management traffic before relying on remote functions. Testing should use observable pass criteria, repeatable steps, and a recovery method that does not depend on undocumented menus. When a result differs from the specification, the team can isolate the affected layer and assign corrective action to the correct party. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
Any uncertainty around service access should be resolved through supplier documentation and a controlled bench test. A stable show network depends on the physical data layer even when remote discovery and monitoring are available. The acceptance team should separate a fixture feature failure from cabling, termination, splitter, library, or console configuration faults. A signed record creates a usable baseline for later service work, firmware changes, and show-file maintenance. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
Define the Network Scope Before the RFQ
Buyers should connect distribution topology to the console, distribution hardware, fixture firmware, and operating procedure used on the project. RDM capability should never be inferred from a DMX connector, a marketing photograph, or a similar model name. Procurement records should preserve the model, firmware, mode file, manual revision, and test result associated with each accepted unit. Clear evidence also helps rental, venue, and integration teams maintain a mixed fleet without assuming that all fixtures behave identically. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
A commissioning plan must compare cable routes against the approved fixture profile and the actual network topology. The installer needs to know which devices pass, block, repeat, or originate management traffic before relying on remote functions. Testing should use observable pass criteria, repeatable steps, and a recovery method that does not depend on undocumented menus. When a result differs from the specification, the team can isolate the affected layer and assign corrective action to the correct party. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
Any uncertainty around console capability should be resolved through supplier documentation and a controlled bench test. A stable show network depends on the physical data layer even when remote discovery and monitoring are available. The acceptance team should separate a fixture feature failure from cabling, termination, splitter, library, or console configuration faults. A signed record creates a usable baseline for later service work, firmware changes, and show-file maintenance. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
For define the network scope before the rfq, the project team should define fixture count as an auditable requirement before equipment is ordered. DMX remains the primary control transport for level and attribute data, while RDM adds bidirectional management only where every relevant device supports it. The requirement should identify who may change addresses, modes, labels, or other parameters and when those changes are permitted. This discipline reduces patch errors and makes future substitutions easier to evaluate without weakening the approved control design. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
| Layer | DMX acceptance | RDM acceptance | Evidence |
|---|---|---|---|
| Fixture | Responds in approved mode | Exact supported functions respond | Current manual and test record |
| Network | Stable data across topology | Management traffic reaches intended devices | Topology drawing and commissioning log |
| Console | Correct patch and attributes | Approved discovery and parameter workflow | Show file, library version and screenshots |
Treat RDM Support as a Verified Product Feature
A commissioning plan must compare device parameters against the approved fixture profile and the actual network topology. The installer needs to know which devices pass, block, repeat, or originate management traffic before relying on remote functions. Testing should use observable pass criteria, repeatable steps, and a recovery method that does not depend on undocumented menus. When a result differs from the specification, the team can isolate the affected layer and assign corrective action to the correct party. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
Any uncertainty around supplier evidence should be resolved through supplier documentation and a controlled bench test. A stable show network depends on the physical data layer even when remote discovery and monitoring are available. The acceptance team should separate a fixture feature failure from cabling, termination, splitter, library, or console configuration faults. A signed record creates a usable baseline for later service work, firmware changes, and show-file maintenance. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
For treat rdm support as a verified product feature, the project team should define published control modes as an auditable requirement before equipment is ordered. DMX remains the primary control transport for level and attribute data, while RDM adds bidirectional management only where every relevant device supports it. The requirement should identify who may change addresses, modes, labels, or other parameters and when those changes are permitted. This discipline reduces patch errors and makes future substitutions easier to evaluate without weakening the approved control design. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
Buyers should connect firmware behavior to the console, distribution hardware, fixture firmware, and operating procedure used on the project. RDM capability should never be inferred from a DMX connector, a marketing photograph, or a similar model name. Procurement records should preserve the model, firmware, mode file, manual revision, and test result associated with each accepted unit. Clear evidence also helps rental, venue, and integration teams maintain a mixed fleet without assuming that all fixtures behave identically. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
Build Addressing Around the Approved Fixture Profile
Any uncertainty around patch records should be resolved through supplier documentation and a controlled bench test. A stable show network depends on the physical data layer even when remote discovery and monitoring are available. The acceptance team should separate a fixture feature failure from cabling, termination, splitter, library, or console configuration faults. A signed record creates a usable baseline for later service work, firmware changes, and show-file maintenance. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
For build addressing around the approved fixture profile, the project team should define start address as an auditable requirement before equipment is ordered. DMX remains the primary control transport for level and attribute data, while RDM adds bidirectional management only where every relevant device supports it. The requirement should identify who may change addresses, modes, labels, or other parameters and when those changes are permitted. This discipline reduces patch errors and makes future substitutions easier to evaluate without weakening the approved control design. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
Buyers should connect channel footprint to the console, distribution hardware, fixture firmware, and operating procedure used on the project. RDM capability should never be inferred from a DMX connector, a marketing photograph, or a similar model name. Procurement records should preserve the model, firmware, mode file, manual revision, and test result associated with each accepted unit. Clear evidence also helps rental, venue, and integration teams maintain a mixed fleet without assuming that all fixtures behave identically. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
A commissioning plan must compare mode selection against the approved fixture profile and the actual network topology. The installer needs to know which devices pass, block, repeat, or originate management traffic before relying on remote functions. Testing should use observable pass criteria, repeatable steps, and a recovery method that does not depend on undocumented menus. When a result differs from the specification, the team can isolate the affected layer and assign corrective action to the correct party. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
Design the Physical DMX Layer First

For design the physical dmx layer first, the project team should define data cable as an auditable requirement before equipment is ordered. DMX remains the primary control transport for level and attribute data, while RDM adds bidirectional management only where every relevant device supports it. The requirement should identify who may change addresses, modes, labels, or other parameters and when those changes are permitted. This discipline reduces patch errors and makes future substitutions easier to evaluate without weakening the approved control design. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
Buyers should connect termination to the console, distribution hardware, fixture firmware, and operating procedure used on the project. RDM capability should never be inferred from a DMX connector, a marketing photograph, or a similar model name. Procurement records should preserve the model, firmware, mode file, manual revision, and test result associated with each accepted unit. Clear evidence also helps rental, venue, and integration teams maintain a mixed fleet without assuming that all fixtures behave identically. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
A commissioning plan must compare splitters against the approved fixture profile and the actual network topology. The installer needs to know which devices pass, block, repeat, or originate management traffic before relying on remote functions. Testing should use observable pass criteria, repeatable steps, and a recovery method that does not depend on undocumented menus. When a result differs from the specification, the team can isolate the affected layer and assign corrective action to the correct party. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
Any uncertainty around connector condition should be resolved through supplier documentation and a controlled bench test. A stable show network depends on the physical data layer even when remote discovery and monitoring are available. The acceptance team should separate a fixture feature failure from cabling, termination, splitter, library, or console configuration faults. A signed record creates a usable baseline for later service work, firmware changes, and show-file maintenance. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
Plan Discovery and Identification Without Disrupting Production
Buyers should connect inventory records to the console, distribution hardware, fixture firmware, and operating procedure used on the project. RDM capability should never be inferred from a DMX connector, a marketing photograph, or a similar model name. Procurement records should preserve the model, firmware, mode file, manual revision, and test result associated with each accepted unit. Clear evidence also helps rental, venue, and integration teams maintain a mixed fleet without assuming that all fixtures behave identically. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
A commissioning plan must compare UID mapping against the approved fixture profile and the actual network topology. The installer needs to know which devices pass, block, repeat, or originate management traffic before relying on remote functions. Testing should use observable pass criteria, repeatable steps, and a recovery method that does not depend on undocumented menus. When a result differs from the specification, the team can isolate the affected layer and assign corrective action to the correct party. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
Any uncertainty around commissioning sequence should be resolved through supplier documentation and a controlled bench test. A stable show network depends on the physical data layer even when remote discovery and monitoring are available. The acceptance team should separate a fixture feature failure from cabling, termination, splitter, library, or console configuration faults. A signed record creates a usable baseline for later service work, firmware changes, and show-file maintenance. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
For plan discovery and identification without disrupting production, the project team should define device labels as an auditable requirement before equipment is ordered. DMX remains the primary control transport for level and attribute data, while RDM adds bidirectional management only where every relevant device supports it. The requirement should identify who may change addresses, modes, labels, or other parameters and when those changes are permitted. This discipline reduces patch errors and makes future substitutions easier to evaluate without weakening the approved control design. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
Decide Which Parameters May Be Changed Remotely
A commissioning plan must compare sensor access against the approved fixture profile and the actual network topology. The installer needs to know which devices pass, block, repeat, or originate management traffic before relying on remote functions. Testing should use observable pass criteria, repeatable steps, and a recovery method that does not depend on undocumented menus. When a result differs from the specification, the team can isolate the affected layer and assign corrective action to the correct party. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
Any uncertainty around operational authority should be resolved through supplier documentation and a controlled bench test. A stable show network depends on the physical data layer even when remote discovery and monitoring are available. The acceptance team should separate a fixture feature failure from cabling, termination, splitter, library, or console configuration faults. A signed record creates a usable baseline for later service work, firmware changes, and show-file maintenance. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
For decide which parameters may be changed remotely, the project team should define address changes as an auditable requirement before equipment is ordered. DMX remains the primary control transport for level and attribute data, while RDM adds bidirectional management only where every relevant device supports it. The requirement should identify who may change addresses, modes, labels, or other parameters and when those changes are permitted. This discipline reduces patch errors and makes future substitutions easier to evaluate without weakening the approved control design. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
Buyers should connect mode changes to the console, distribution hardware, fixture firmware, and operating procedure used on the project. RDM capability should never be inferred from a DMX connector, a marketing photograph, or a similar model name. Procurement records should preserve the model, firmware, mode file, manual revision, and test result associated with each accepted unit. Clear evidence also helps rental, venue, and integration teams maintain a mixed fleet without assuming that all fixtures behave identically. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
Validate Fixture Responses During Commissioning
Any uncertainty around error handling should be resolved through supplier documentation and a controlled bench test. A stable show network depends on the physical data layer even when remote discovery and monitoring are available. The acceptance team should separate a fixture feature failure from cabling, termination, splitter, library, or console configuration faults. A signed record creates a usable baseline for later service work, firmware changes, and show-file maintenance. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
For validate fixture responses during commissioning, the project team should define identify command as an auditable requirement before equipment is ordered. DMX remains the primary control transport for level and attribute data, while RDM adds bidirectional management only where every relevant device supports it. The requirement should identify who may change addresses, modes, labels, or other parameters and when those changes are permitted. This discipline reduces patch errors and makes future substitutions easier to evaluate without weakening the approved control design. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
Buyers should connect status reporting to the console, distribution hardware, fixture firmware, and operating procedure used on the project. RDM capability should never be inferred from a DMX connector, a marketing photograph, or a similar model name. Procurement records should preserve the model, firmware, mode file, manual revision, and test result associated with each accepted unit. Clear evidence also helps rental, venue, and integration teams maintain a mixed fleet without assuming that all fixtures behave identically. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
A commissioning plan must compare parameter readback against the approved fixture profile and the actual network topology. The installer needs to know which devices pass, block, repeat, or originate management traffic before relying on remote functions. Testing should use observable pass criteria, repeatable steps, and a recovery method that does not depend on undocumented menus. When a result differs from the specification, the team can isolate the affected layer and assign corrective action to the correct party. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
Control Firmware, Libraries and Documentation Together

For control firmware, libraries and documentation together, the project team should define software version as an auditable requirement before equipment is ordered. DMX remains the primary control transport for level and attribute data, while RDM adds bidirectional management only where every relevant device supports it. The requirement should identify who may change addresses, modes, labels, or other parameters and when those changes are permitted. This discipline reduces patch errors and makes future substitutions easier to evaluate without weakening the approved control design. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
Buyers should connect fixture library to the console, distribution hardware, fixture firmware, and operating procedure used on the project. RDM capability should never be inferred from a DMX connector, a marketing photograph, or a similar model name. Procurement records should preserve the model, firmware, mode file, manual revision, and test result associated with each accepted unit. Clear evidence also helps rental, venue, and integration teams maintain a mixed fleet without assuming that all fixtures behave identically. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
A commissioning plan must compare manual revision against the approved fixture profile and the actual network topology. The installer needs to know which devices pass, block, repeat, or originate management traffic before relying on remote functions. Testing should use observable pass criteria, repeatable steps, and a recovery method that does not depend on undocumented menus. When a result differs from the specification, the team can isolate the affected layer and assign corrective action to the correct party. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
Any uncertainty around change approval should be resolved through supplier documentation and a controlled bench test. A stable show network depends on the physical data layer even when remote discovery and monitoring are available. The acceptance team should separate a fixture feature failure from cabling, termination, splitter, library, or console configuration faults. A signed record creates a usable baseline for later service work, firmware changes, and show-file maintenance. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
Select Products With Evidence From Current Data
Buyers should connect DMX modes to the console, distribution hardware, fixture firmware, and operating procedure used on the project. RDM capability should never be inferred from a DMX connector, a marketing photograph, or a similar model name. Procurement records should preserve the model, firmware, mode file, manual revision, and test result associated with each accepted unit. Clear evidence also helps rental, venue, and integration teams maintain a mixed fleet without assuming that all fixtures behave identically. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
A commissioning plan must compare fixture identity against the approved fixture profile and the actual network topology. The installer needs to know which devices pass, block, repeat, or originate management traffic before relying on remote functions. Testing should use observable pass criteria, repeatable steps, and a recovery method that does not depend on undocumented menus. When a result differs from the specification, the team can isolate the affected layer and assign corrective action to the correct party. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
Any uncertainty around application fit should be resolved through supplier documentation and a controlled bench test. A stable show network depends on the physical data layer even when remote discovery and monitoring are available. The acceptance team should separate a fixture feature failure from cabling, termination, splitter, library, or console configuration faults. A signed record creates a usable baseline for later service work, firmware changes, and show-file maintenance. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
For select products with evidence from current data, the project team should define RDM listing as an auditable requirement before equipment is ordered. DMX remains the primary control transport for level and attribute data, while RDM adds bidirectional management only where every relevant device supports it. The requirement should identify who may change addresses, modes, labels, or other parameters and when those changes are permitted. This discipline reduces patch errors and makes future substitutions easier to evaluate without weakening the approved control design. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
Verified DMX512 and RDM product references


Write FAT and SAT Tests for DMX and RDM
A commissioning plan must compare fault isolation against the approved fixture profile and the actual network topology. The installer needs to know which devices pass, block, repeat, or originate management traffic before relying on remote functions. Testing should use observable pass criteria, repeatable steps, and a recovery method that does not depend on undocumented menus. When a result differs from the specification, the team can isolate the affected layer and assign corrective action to the correct party. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
Any uncertainty around recorded acceptance should be resolved through supplier documentation and a controlled bench test. A stable show network depends on the physical data layer even when remote discovery and monitoring are available. The acceptance team should separate a fixture feature failure from cabling, termination, splitter, library, or console configuration faults. A signed record creates a usable baseline for later service work, firmware changes, and show-file maintenance. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
For write fat and sat tests for dmx and rdm, the project team should define factory test as an auditable requirement before equipment is ordered. DMX remains the primary control transport for level and attribute data, while RDM adds bidirectional management only where every relevant device supports it. The requirement should identify who may change addresses, modes, labels, or other parameters and when those changes are permitted. This discipline reduces patch errors and makes future substitutions easier to evaluate without weakening the approved control design. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
Buyers should connect site test to the console, distribution hardware, fixture firmware, and operating procedure used on the project. RDM capability should never be inferred from a DMX connector, a marketing photograph, or a similar model name. Procurement records should preserve the model, firmware, mode file, manual revision, and test result associated with each accepted unit. Clear evidence also helps rental, venue, and integration teams maintain a mixed fleet without assuming that all fixtures behave identically. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
| Test | Method | Pass evidence |
|---|---|---|
| DMX mode | Patch approved profile and exercise attributes | Recorded response matches mode chart |
| Discovery | Scan the intended branch with approved tools | Expected devices identified without duplicates |
| Parameter control | Read and change only approved parameters | Readback and fixture behavior agree |
| Recovery | Restore baseline after an intentional change | Patch, labels and records return to baseline |
Prepare a Supplier Documentation Package
Any uncertainty around service contacts should be resolved through supplier documentation and a controlled bench test. A stable show network depends on the physical data layer even when remote discovery and monitoring are available. The acceptance team should separate a fixture feature failure from cabling, termination, splitter, library, or console configuration faults. A signed record creates a usable baseline for later service work, firmware changes, and show-file maintenance. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
For prepare a supplier documentation package, the project team should define manuals as an auditable requirement before equipment is ordered. DMX remains the primary control transport for level and attribute data, while RDM adds bidirectional management only where every relevant device supports it. The requirement should identify who may change addresses, modes, labels, or other parameters and when those changes are permitted. This discipline reduces patch errors and makes future substitutions easier to evaluate without weakening the approved control design. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
Buyers should connect mode charts to the console, distribution hardware, fixture firmware, and operating procedure used on the project. RDM capability should never be inferred from a DMX connector, a marketing photograph, or a similar model name. Procurement records should preserve the model, firmware, mode file, manual revision, and test result associated with each accepted unit. Clear evidence also helps rental, venue, and integration teams maintain a mixed fleet without assuming that all fixtures behave identically. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
A commissioning plan must compare device support against the approved fixture profile and the actual network topology. The installer needs to know which devices pass, block, repeat, or originate management traffic before relying on remote functions. Testing should use observable pass criteria, repeatable steps, and a recovery method that does not depend on undocumented menus. When a result differs from the specification, the team can isolate the affected layer and assign corrective action to the correct party. The outcome is a control system that remains understandable to operators, technicians, buyers, and suppliers throughout its service life.
Frequently Asked Questions
Does every DMX fixture support RDM?
No. RDM is an additional capability that must be verified for the exact model and firmware. A DMX connector alone does not prove RDM support.
Can RDM replace a fixture profile?
No. The console still needs a correct fixture profile for channel modes and attributes. RDM can assist management on compatible equipment but does not replace patch documentation.
Should technicians change addresses remotely during a show?
Only if the operating procedure explicitly permits it and the impact is understood. Many teams restrict configuration changes to commissioning or maintenance windows.
What network components must support RDM?
The intended management path, including relevant splitters, gateways, consoles, and fixtures, must pass or handle RDM correctly. Verify the actual topology rather than assuming compatibility.
What should a supplier provide for RDM acceptance?
Request the exact supported functions, model and firmware identity, current manual, mode chart, fixture profile resources, known limitations, and a repeatable test record.
How should mixed fleets be documented?
Record each model, firmware version, control mode, address, profile version, RDM support status, device identity, and test result so technicians do not apply one fixture's behavior to another.
You May Also Like
8 Eyes 500mW Red Laser Bar Moving Head Light
8 Eyes Red Laser Bar features 8×500mW 638nm red lasers, 180° scanning and 17CH DMX512 control, delivering dynamic beam and strobe effects for DJs, clubs and stages.
RGBW 4-in-1 LED Butterfly Disco Light with Laser, Strobe & Wash Effects
RGBW 4-in-1 LED Butterfly Disco Light combines butterfly beams, LED wash, red and green laser effects and strobe lighting, ideal for DJs, clubs, parties and stage events.
37 Eyes RGB/R Laser Storm Light with Infinite Rotation for DJ Disco Stage
37 Eyes RGB Laser Storm Light with 24 red, 12 green and 1 blue laser, infinite rotation, 1.5° beam angle and DMX512 control for DJs, clubs, discos and events.
Mini 5-in-1 Magic Ball LED Laser Stage Effect Light with remote
Mini 5-in-1 DJ Stage Light combines RGB LED effects, red and green lasers, magic ball beams and white strobe, with DMX512, sound activation and wireless remote control.
Need Expert Advice on Your Lighting Setup?
If you have any comments or good suggestions, please leave us a message; later our professional staff will contact you as soon as possible.